SERVICE TYPE |
CONTRACTOR
|
OBJECT
|
PHOTO
|
INTERVENTORY
|
TRANSELCA S.A. E.S.P.
|
INTERVENTORY FOR PROVISIONAL CONNECTION IN TYPE T TO STN LINE SANTAMARTA – FOUNDATION AT 220 kV FOR NEW SE DRUMMOND |
![](http://www.ems.net.co/wp-content/uploads/clip_image002.jpg)
|
INTERVENTORY
|
CONSULTORES UNIDOS S.A
|
INTERVENTORIA PROJECT CONNECTION 110KV-GECELCA 3 IN THE CERROMATOSO SUBSTATION |
Line output GECELCA 1 y 2 LN 764 y LN 765 in new substation GECELCA 3 A 110 kV![](http://www.ems.net.co/wp-content/uploads/clip_image006.jpg)
Arrival of lines GECELCA 1 LN 764 y 2 LN 765 in substation CERROMATOSO a 110 kV |
INTERVENTORY
|
CONSULTORES UNIDOS S.A
|
INTERVENTORÍA CONEXIÓN AMPLIACIÓN SUBSTACION SANTA MARTA 220/110/34.5/13.8 KV |
![](http://www.ems.net.co/wp-content/uploads/clip_image008.jpg)
|
INTERVENTORY
|
CONSULTORES UNIDOS S.A
|
INTERVENTORY CONNECTION EXTENSION SUBSTATION. NEW BARRANQUILLA at 110 kV and 13.8 kV, TRANSFORMER OF POWER TNBQ06, 45 MVA |
![](http://www.ems.net.co/wp-content/uploads/clip_image010.jpg) |
INTERVENTORY
|
CONSULTORES UNIDOS S.A
|
INTERVENTORY CONNECTION EXTENSION SUBSTATION SABANALARGA, 220 / 13.8 kV 90 MVA TSAC 11 |
![](http://www.ems.net.co/wp-content/uploads/clip_image012.jpg)
|
INTERVENTORY
|
TRANSELCA S.A. E.S.P.
|
INTERVENTORY UPME third party connection in TRANSELCA substations, Substation extension Valledupar 220 kV, according to the call UPME 08-2015 |
![](http://www.ems.net.co/wp-content/uploads/clip_image014.jpg) |
INTERVENTORY
|
TRANSELCA S.A. E.S.P.
|
TRANSELCA – UPME third party supervision in substations of TRANSELCA, Valledupar substation extension of 110 kV, according to UPME call STR-06-2015 |
![](http://www.ems.net.co/wp-content/uploads/clip_image016.jpg)
Power transformer 100 MVA, 220/110 kV, S / E VAL
![](http://www.ems.net.co/wp-content/uploads/clip_image018.jpg)
Extension Valledupar substation to 110 kV
|
INTERVENTORY
|
TRANSELCA S.A. E.S.P.
|
TRANSELCA – UPME third party supervision in substations of TRANSELCA, Cuestecita 110 kV substation extension, according to UPME call STR-01-2015 |
![](http://www.ems.net.co/wp-content/uploads/clip_image020.jpg)
Expansion of 110 kV electric substation encapsulated in SF6 – GIS.
Power transformer bays at 110 kV GIS.
|
INTERVENTORY
|
TRANSELCA S.A. E.S.P.
|
TRANSELCA – UPME third party supervision in TRANSELCA substations, Cerromatoso 110 kV substation extension |
![](http://www.ems.net.co/wp-content/uploads/clip_image022.jpg)
|
INTERVENTORY
|
TRANSELCA S.A. E.S.P.
|
Supervision of work control in El Bosque substation, A 220 kV, according to the call StR-07-2015 |
![](http://www.ems.net.co/wp-content/uploads/clip_image024.jpg)
|
INTERVENTORY
|
GRUPO ARGOS
|
ELECTRICAL INTERVENTORIA FOR URBAN DEVELOPMENT PROJECTS:
- VILLA CAROLINA STAGE 8
- FINAL STAGE OF EXECUTION OF THE PORTAL EMPRESARIAL DEL NORTE PROJECT P.E.N.
|
![](http://www.ems.net.co/wp-content/uploads/clip_image026.jpg)
Villa Carolina stage 8
|
INTERVENTORY
|
GRUPO ARGOS
|
ELECTRICAL INTERVENTORY FOR URBAN DEVELOPMENT PROJECTS:
- INTERNATIONAL CENTER OF THE CARIBBEAN. C.I.C.
- LAGO ALTO STAGE 1
|
![](http://www.ems.net.co/wp-content/uploads/clip_image028.jpg)
Enclosures for medium voltage cells underground circuits.
![](http://www.ems.net.co/wp-content/uploads/clip_image030.jpg)
Medium voltage cells 13.8 kV underground circuits
![](http://www.ems.net.co/wp-content/uploads/clip_image032.jpg)
Street lighting
|
INTERVENTORY
|
GRUPO ARGOS
|
ELECTRICAL INTERVENTORY FOR URBAN DEVELOPMENT PROJECTS:
PUBLIC LIGHTING PARK MIRAMAR STREET 100 |
![](http://www.ems.net.co/wp-content/uploads/clip_image034.jpg)
Street lighting
|